N101 Roof Replacement

Replacement of the N101 roof is almost complete! The new light and heat reflecting membrane is installed, and the final steps are installing the bronze metal flashing and caps around the perimeter. After this, N101 will be ready for the final installation of the rooftop solar array.

N101 Roof Replacement

 

South Campus

2000 Welding Lab Project

Construction of the Welding Lab in 2000 is well under way, with the new LED lighting installed and the new, self-contained welding stations being placed and connected.