North Campus
N101 Roof Replacement
Replacement of the N101 roof is complete! N101 is ready for the installation of the rooftop solar array and the new HVAC system with the penthouse for ductwork.
N101 & N103 Rooftop Solar Installation
With the completion of the N101 roof replacement, the installation of solar panels on both N101 and N103 has resumed. The new panels are installed on the support frames on the roof of N103.
South Campus
South Campus Renumbering
South Campus has new signage with new building and new room numbers for Fall 2022! As part of the long-term plan to standardize our building and room numbers for both clarity and to allow expansion of the campuses with new buildings, the College completed the North Campus renumbering in 2021, and has now completed the South Campus renumbering.
A quick recap of South Campus:
1000 is now S201 (South / 200 series / 1st building)
2000 is now S202 (South / 200 series / 2nd building)
3000 is now S203 (South / 200 series / 3rd building)
Early College Classroom is S206
Early College Administration is S205
8000 is now S208
Tactical Training is now S210
The rooms are also renumbered, with the number progressing clockwise from the main entrance, and each number starting with the floor level.
In addition to room numbers, directional signs have been added throughout the building to assist with locating room numbers and functions.
S201 (2000) Welding Lab Project
Construction work continues in the Welding Lab in S201 (formerly 2000) with the new, self-contained welding stations being completed.