North Campus

Fire Training Ground

The Fire and Emergency Services Training Facility construction continues as the finishing components are added – doors, railings, handrails and shutters.

The Fire Training Tower nears completion.

 

Breachable doors for training are installed the building. The spring-loaded hardware is designed to be breached with a firefighter’s pike.

Breachable doors are installed.

 

Handrails on the prefabricated concrete stairs inside the stair tower have now been installed.

Stairwell handrails are in place.

 

Outdoor Learning Center Phase II

Construction on the Outdoor Learning Center Phase II continues with the completion of the roof deck, roof membrane, and stage surface. The back wall and support floors are framed and being covered with siding. The concrete seating walls are near completion. The main concrete stairs leading up to the stage are being prepared for pouring.

 

Outdoor Learning Center Construction

 

The amphitheater and tiered seating under construction viewed from overhead.

Tiered seating is being installed