Current Construction Projects

Division of College Environment

North Campus

North Automotive Building Design

Architect: Little Architects

Contractor: TBD

Design Only

Budget:  $2,500,000

Project Information

Design is underway for a future automotive building that will be funded later for construction.

The image is a bubble diagram map for Rowan-Cabarrus Community College, labeled

 

Anticipated Completion Date: TBD

North N105 Auditorium

Architect: CreenbergFarrow

Contractor: Heartland Contracting

Design Bid Build

Budget:  $1,908,000

Project Information

Construction is in progress for the 250-seat auditorium renovation, and includes new seating, finishes, and technology upgrades.

Modern lecture hall with tiered blue seats, geometric wall patterns, and a curved stage with screens.

Demolition is nearing completion and even a little renovation has started!  The new steps up the middle of the seating areas are framed ready for concrete. 

Construction site with scaffolding around tiered seating and framed wooden steps.

The floor cuts for the new underfloor HVAC ductwork have started.

Interior construction site with floor cuts for underfloor HVAC ductwork, concrete slabs, scaffolding, and a construction cart.

Anticipated Completion Date: Spring 2026

North Water & Sewer Infrastructure Extensions

Architect: Timmons Group

Contractor: TBD

Delivey Method:

Budget: $1,500,000

Project Information

Design is underway for extending utility infrastructure to the central area of North Campus to support new buildings in that area.

Architectural site plan of a proposed utility infrastructure extension on campus.

Anticipated Completion Date: Spring 2026

North Technology Education Complex

Architect: ADW Architects

Contractor: Turner Construction

Construction Manager at Risk

Budget: $46,000,000

Project Information

Design is underway for the 40,000 SF Advance Manufacturing Building and the 18,000 SF Career & College Promise Building.

Anticipated Completion Date: Summer 2027

North Parking Lot A and B Remodel and Navigation Way Tie In

Architect: Timmons Group

Contractor: Vannoy Construction

Construction Manager at Risk

Budget:  $5,131,500

Project Information

Design is underway for remodeling parking lots A and B, and realigning Navigation Way to support new buildings in the central area of North Campus.Blueprint of North Campus showing plans for parking lots, pedestrian pathways, and surrounding buildings. Transcribed Text: Parking Lot A Count: 266 Spaces Parking Lot B Count: 158 Spaces

Anticipated Completion Date: Fall 2026

North Driver Training Range

Architect: C Design

Contractor: Ike’s Construction

Design Build

Budget:  $9,600,000

Project Information

Design is underway for the 10,000 SF classroom building, the 3-acre driving pad, and training course for first responders.

Architectural rendering of a modern building with large windows, the College logo, and a parked truck.

Anticipated Completion Date: Spring 2027

South Campus

South Geothermal HVAC

Architect: CMTA

Contractor: Turner Construction

Construction Manager at Risk

Budget: $6,350,500

Project Information

Design is underway for the College’s first geothermal well field project for South Campus.

a blue print showing the plans for a geothermal well field

Anticipated Completion Date: Fall 2026

CBTC

College Station

Advanced Technology Center

NCRC Aseptic Lab

Architect: The Bogle Firm

Construction Manager At-Risk: Ike’s Construction

Budget: $486,000

Project Information

Construction of the aseptic lab is progressing as planned.  The drywall and joint compound installations have started. This view shows the observation room looking into the lab space.

A construction site of an aseptic lab with unfinished drywall, ladders, and exposed ceiling ducts.

This view shows aseptic lab looking into the gowning room and the observation room.

An unfinished aseptic lab space with construction materials.

Anticipated Completion Date: Fall 2025